“hard working guys care so much about doing a great job”
Epoxy floor coatings in Lenawee County, MI
A 2-day epoxy floor system for garages, basements, barns and workshops: diamond-ground concrete, a thick epoxy base coat with full flake, and a polyaspartic topcoat that wipes clean and stands up to hot tires and road salt. Free estimates across Lenawee County and within about an hour of Tipton, from Adrian and Tecumseh to Ann Arbor, Jackson and Hillsdale.
- Free estimates
- 15-Year Warranty
Takes about 30 seconds
Get a free estimate in 30 seconds
What kind of floor are you looking to coat?
No obligationFree estimate
- 5.0Google rating, 32 reviews
- 2 daysOn-site install
- FreeEstimates, price before you book
- 15-YearWarranty
Floor coatings
Garages, basements, barns and workshops
We coat concrete floors in the places you use every day. Each project starts with a look at the slab, then the right preparation and finish for how the space gets used.

- 01
Garage floor coatings
The most common project we do. A ground, prepped and coated garage floor that looks finished and is easier to keep clean than bare concrete.
- 02
Basement floor coatings
A coated slab for storage rooms, hobby spaces and finished basements. We check the concrete and ask about moisture before recommending anything.
- 03
Barn & workshop floor coatings
Floors for the places you build, store and work. Tell us what the space sees day to day and we plan the coating around it.
Our work
One garage, start to finish
The same House of Epoxy garage project from different angles: before, after, up close and mid-install.
What changed
Day 1: the slab was diamond-ground and repaired, then a thick epoxy base coat went down with a full gray flake broadcast. Day 2: the excess flake was scraped off and a clear polyaspartic topcoat sealed it in.
The result is a floor that reads as one finished surface from the door to the back wall, including the step and the base of the walls.
Ask about your garage


How it works
From your first call to a finished 2-day floor
Here is what happens when you contact us, and what each of the two install days is for.
Call or email with the basics
Tell us where you are, what kind of space it is and roughly how big. Photos of the concrete help.
Get a free estimate
We look at the slab, talk through cracks, moisture and the finish you want, and give you a price with the scope spelled out before anything is booked.
Day 1: grind, repair, epoxy base coat and flake
We diamond-grind the concrete to open the surface, repair cracks and pits, roll on a thick epoxy base coat and broadcast the flake to rejection. The epoxy cures overnight.
Day 2: scrape and polyaspartic topcoat
We scrape and vacuum the excess flake, then apply the clear polyaspartic topcoat that locks the flake in and gives the floor its resistance to hot tires, road salt and spills.
Cure times and care guidance
Walk-on, move-back-in and drive-on times depend on the topcoat and the weather. You get them for your floor before we leave, along with how to look after it.
Why two days
Why we install a 2-day system instead of a one-day coating
A one-day coating is thin and fast. The 2-day system takes the extra day because the epoxy base coat cures overnight before the topcoat goes on, and that is where the thickness, the bond and the moisture tolerance come from.
A thicker floor with a real epoxy base
A true epoxy base coat builds far more film than the thin polyurea primer in a one-day coating, so there is more floor between your concrete and daily wear.
A stronger bond to the concrete
Diamond grinding opens the slab and the slow-curing epoxy soaks into it, instead of sitting on top of dust and old sealer.
Better tolerance for damp Michigan slabs
Epoxy is more forgiving of moisture in the concrete than fast-cure coatings, which matters on garage floors that see snow, salt and spring thaw.
A polyaspartic topcoat that wipes clean
UV-stable so it holds its color, and it stands up to hot tires, road salt, oil and spills that would soak into bare concrete.
Straight answers about your slab
If cracks, moisture or an old coating change the plan, we say so before work starts, not after.

Meet the owners
Brennan Schnaidt and Kaden Settles
House of Epoxy is owned and run by Brennan and Kaden. Both worked in floor coatings before starting the company, and both are on site for the grinding, the epoxy base coat and the topcoat.
The company is based in Tipton and works across Lenawee County and the surrounding counties. Call or email with your concrete, how you use the space and the finish you have in mind, and they will set up your free estimate.
Reviews
Rated 5.0 on Google across 32 reviews
Short excerpts from verified public reviews. The full reviews are on the Google and Facebook profiles.
“very friendly and easy to work with”
Service area
Based in Tipton. Serving Lenawee County and within an hour.
Adrian, Tecumseh and Clinton are minutes away. Ann Arbor, Jackson, Hillsdale and Monroe are all within about an hour, and so is everything in between: Saline, Chelsea, Milan, Brooklyn, Jonesville, Dundee, Blissfield, Hudson and more.
- TiptonHome base
- Adrian
- Tecumseh
- Clinton
- Ann Arbor
- Jackson
- Hillsdale
- Monroe
- Lenawee, Jackson, Washtenaw, Hillsdale and Monroe counties. See the full list of towns
Questions
Answers before you call
What most people ask about cost, timing and concrete. Anything else, call and ask.
Where does House of Epoxy work?
We are based in Tipton, Michigan, and serve Lenawee County plus anywhere within about an hour's drive: Adrian, Tecumseh, Clinton, Blissfield and Hudson; Jackson and Brooklyn; Ann Arbor, Saline, Chelsea and Milan; Hillsdale and Jonesville; Monroe and Dundee, and the townships in between. The service area page lists every community by county.
What is a 2-day epoxy system?
A two-day floor uses a thick epoxy base coat on Day 1, with decorative flake broadcast into it, and a clear polyaspartic topcoat on Day 2 after the epoxy has cured overnight. One-day coatings skip the epoxy and use a thin, fast-curing polyurea base so the whole floor goes in and cures in a day. The extra day buys a thicker floor, a stronger bond to the concrete and better tolerance for moisture in the slab.
How much does an epoxy floor cost?
The price depends on the size of the floor, the condition of the concrete, the prep and repairs it needs and the finish you choose. The estimate is free, and the scope is spelled out before you decide.
How long does installation take?
Two days on site. Day 1 is diamond grinding, crack repair, the epoxy base coat and the flake broadcast, and the epoxy cures overnight. Day 2 is scraping the flake and applying the polyaspartic topcoat. When you can walk on it, move things back and park depends on the topcoat and the weather, and we go over those cure times for your project.
Can you coat cracked or worn concrete?
Often, but we need to see it first. Surface wear and minor cracks are normally handled during prep. Deep cracks, movement or ongoing moisture can limit what a coating can do, and we will tell you before work starts.
Do you coat basements, barns and workshops?
Yes. Garages are the most common project, but we coat basement, barn and workshop floors too. How the space is used and the condition of the slab shape the approach.
How do I get an estimate?
Call (517) 457-5546 or email info@house-of-epoxy.com with your location, the type of space and its approximate size. We set up your free estimate from there.
Free estimates
Ready to talk about your floor?
Tell us about the space in two quick steps, or call. Either way you get a look at the slab and a written price with the scope spelled out before anything is booked.



